Sign In | Join Free | My chinacsw.com
China Jinzhou City Shitan Machinery Equipment CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
Verified Supplier

7 Years

Home > Pneumatic Drilling Rig >

Project Deep Water Pneumatic Drilling Rig 400m

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Project Deep Water Pneumatic Drilling Rig 400m

  • 1
  • 2

Brand Name : ShiTan

Model Number : ST400

Certification : ISO9001

Place of Origin : China

MOQ : Negotiation

Price : Negotiation

Payment Terms : L/C, D/A, T/T, Western Union

Supply Ability : 10000year

Delivery Time : Within 7-12 days

Packaging Details : Wooden box

Type : hydraulic crawler drilling machine

Max. Drilling depth : 400

Dimension(L*W*H) : 6m×2m×2.5m

Power Type : 89

feature : high drilling efficiency

Drilling diameter : 105-300mm

Rod length : 6M

Lifting force : 22T

Fast lifting speed : 24m/min

Warranty : 1 Year

Contact Now

The project uses deep-water drilling rig to drill 400m pneumatic water well drilling rig

Introduction of crawler type Crawler Mounted Drill Rig

Water well drilling rig is a complex machine, which is composed of machine, unit and mechanism. Water well drilling rig is a mechanical equipment that drives drilling tools to drill underground and obtain physical and geological data during the exploration or development of mineral resources (including solid ore, liquid ore, gas ore, etc.) Also called drilling machine. The main function of water well drilling rig is to drive the drilling tool to break the rock at the bottom of the hole and lower or lift the drilling tool in the hole. It can be used for core, ore core, rock cuttings, gas samples, liquid samples, etc., Find out the underground geology and mineral resources

Parameters of crawler type Crawler Mounted Drill Rig

Product Name
Pneumatic Drilling Rig
Model
ST400
Drilling Diameter
105-300mm
Drilling Depth
400m
One-time Advance Length of the Drill
3000/6000mm
Walking Speed
6km/h
Climbing Ability
25
Min. Ground Clearance
300mm
Working Air Pressure
1.7-3.5Mpa
Air Consumption
17-35m3/min
Main Power
100KW/6Cylinder
Rotation
45-75rpm
Rotary Torque
9000-10000N.m
Dimension

6m×2m×2.5m

Total Weight
10T

Operation of well drilling machine when adding drill pipe

1. When the depth of one drill pipe needs to be connected after drilling, stop the propulsion first, then stop the rotation, and turn off the cooling water;
2. Stop the rotation and operate the fast forward and backward handle to the fast backward position to make the chuck quickly back in place; 3. The gyrator reverses, at the same time, it retreats the feed oil cylinder to rotate the water braid shaft away from the drill pipe;
4. Operate the clamping handle to make the gripper clamp the drill pipe and open the micro regulating flow valve (right rotation)
5. Connect the drill pipe to be added to the previous drill pipe, and the rotator moves forward while rotating. When the trapezoidal conical thread of the water braid shaft is in screw contact with the conical thread of the newly added drill pipe, immediately operate the gripper handle, loosen the gripper and complete the drill pipe addition.

Technical advantages of water well drilling rig platform


High construction efficiency: full hydraulic top drive, meeting the construction of L-shaped well and high drilling efficiency; Intellectualization: automatic loading and unloading of drill pipe to reduce manual labor intensity; High mobility: all terrain off-road chassis, suitable for complex road conditions; Multi technology drilling: air DTH hammer, mud drilling and other construction technologies.
1. Power system to provide energy for the whole drilling rig;
2. Working system, equipment working according to process requirements;
3. Transmission system is the equipment that transmits, transports and distributes energy for the work unit;
4. Control system, control all systems and equipment, and accurately coordinate work according to process requirements;
5. Auxiliary system, equipment of auxiliary main system.

Project Deep Water Pneumatic Drilling Rig 400mProject Deep Water Pneumatic Drilling Rig 400mProject Deep Water Pneumatic Drilling Rig 400mProject Deep Water Pneumatic Drilling Rig 400mProject Deep Water Pneumatic Drilling Rig 400mProject Deep Water Pneumatic Drilling Rig 400mProject Deep Water Pneumatic Drilling Rig 400mProject Deep Water Pneumatic Drilling Rig 400m

Product Tags:

pneumatic drilling rig 400m

      

deep water pneumatic drilling rig

      

project crawler water well drilling rig

      
Quality Project Deep Water Pneumatic Drilling Rig 400m for sale

Project Deep Water Pneumatic Drilling Rig 400m Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0